Is my extension ready for a stage payment?
Being asked for a stage payment is normal. Wanting to understand what you are paying for is also normal, and it does not mean you distrust your builder.
The useful question is not 'does it look finished?'. It is 'what did we agree this stage means, and does the work meet that?'.
Start with what was agreed
Look at your contract, quotation or payment schedule and find the wording for the stage in question. If the wording is short, it may need to be turned into a clearer list of criteria before the next stage.
A sensible checklist for a watertight stage
As an illustration only, a watertight milestone might be defined as:
- Primary roof structure complete
- Roof covering installed
- Membranes installed where applicable
- Flashings completed
- Rooflights installed where included
- External windows and doors installed where included
- Openings appropriately weatherproofed
- Relevant inspection evidence available where applicable
If you are not sure
Independent milestone verification gives you an evidence-based record rather than an opinion exchanged over text messages. Remote verification starts from £99 and reviews timestamped photographs, video, drawings and other supporting documents against the agreed criteria. Site verification starts from £249 where physical attendance is appropriate.
A verification result is not a survey, a warranty, or a judgement about the overall quality of the project. It records whether the agreed criteria for that milestone appear to have been satisfied on the evidence reviewed.
Important
This page is general information about how construction stage payments and independent milestone verification usually work. It is not legal advice, and it is not a statement about your own contract.
Keep reading
Related guides
Builder stage payments explained
Most domestic building projects are paid in stages rather than in one payment at the end. Each stage is meant to represent an agreed point in the work.